| 1 | Akkuyu Nuclear Power Plant Preparation of bid specifications and terms of reference for Nuclear Power Plant Consortium with KAERI (Korean Atomic Energy Research Institute) |
Turkey | Turkish Electricity Authority | 1995-1998 |
| 2 | 770 MWe Baymina CCGP Provide services for contracting. Transfer of the plant to TRACTABEL as per BOT |
Turkey | TRACTABEL | 1998-1999 |
| 3 | Bishkek Power Plant Preparation of rehabilitation tender documents as per WB Norms |
Kyrgyzstan | Bishkek Power Plant Operation Directorate | 1997 |
| 4 | Consultancy for preparation of tender documents engineering installation and commissioning of Machine MMS Seyfiömer TPP Unit 1 and 2 |
Turkey | ePRO Elektronik - Systemtechnik GmbH | 2001 |
| 5 | Overview report preparation for energy policy of Turkey in generation | China | CMC | 2001 |
| 6 | "Consultancy for preparation of tender documents for Machine MMS UNIMAR CCGP |
Turkey | ePRO Elektronik - Systemtechnik GmbH | 2003 |
| 7 | Pre Study for increasing the participation capacity of EUAS TPPS to primary frequancy control
Ambarlı TPP (630 MW) Kangal TPP (300 MW) Orhaneli TPP (210 MW) Seyitömer TPP (600 MW) Soma TPP (900 MW) Tunçbilek TPP (300 MW) |
Turkey | IASE - Instytut Autontyki Systemow Energetyccznych Poland | 2005 |
| 8 | Pre-engineering study for lignutie fired boiler OB - 660 Kemerköy and Yatağan TPPs |
Turkey | Energopomiar S.A., Poland | 2005 |
| 9 | Consultancy in preparation of tender documents for retrofitting boilers Kemerköy TPP |
Turkey | Energopomiar S.A., Poland | 2005 |
| 10 | Modernization of turbine monitoring and supervision system Seyitömer TPP (2x150) |
Turkey | ePRO Elektronik - Systemtechnik GmbH | 2005 |
| 11 | Consultancy in preparation of tender documents for retrofitting and rehabilitation of electrostatic precipitators Seyitömer TPP |
Turkey | Energomontaz-podnie S.A. Polonya | 2006 |
| 12 | Consultancy in preparation of tender documents for Turbine Vibrations monitoring and diagnosis Yeniköy TPP |
Turkey | ePRO Elektronik - Systemtechnik GmbH | 2006 |
| 13 | Rehabilitation in EÜAŞ HEPPs Preparation of feasibility studies and tender documents for SCADA implementation and remote control center in 23 hydro electrical power plants |
Turkey | INDRA | 2006-2007 |
| 14 | Rehabilitation in EÜAŞ's 23 HEPPs Preparation of feasibility studies and tender documents for improvement of ancillary services |
Turkey | PB/Mercados | 2006-2007 |
| 15 | Consultancy Services The preparation of tender documents for the project "Feasibility Study on Determination of Measurement, Monitoring and SCADA Systems to Estimate the Hydro-electric Potantial in Selected Basins of Turkey" |
Turkey | EIE | 2007-2008 |
| 16 | Consultancy Services Preparation of TOR for reorganization and restructuring the operation and maintenance system of hydraulic power plants to be operated from remote control center |
Turkey | EÜAŞ | 2007-2008 |
| 17 | Consultancy Services Preparation of TOR for site and HPP selection survey for application of pumped storage hydro plants in the water basins of Turkey |
Turkey | EÜAŞ | 2007-2008 |
| 18 | Consultancy Services Preparation for TOR for capacity turbine efficiency increase and implementation of "Remote Control System - SCADA" to hydraulic power plants in Dicle, Seyhan and Ceyhan basins |
Turkey | EÜAŞ | 2007-2008 |
| 19 | Consultancy Services Preparation of TOR for determining the capacity betterment and increase ability of small hydraulic by rehabilitation and modernization of the turbine, automation systems and to improve operation performances according to the grid needs |
Turkey | EÜAŞ | 2007-2008 |
| 20 | Tender preparation for EÜAŞ's 23 HEPPs | Turkey | EÜAŞ | 2008-Devam |
| 21 | Consultancy services for finding Turkish investors | India | Moser Baer Inc. | 2008 |
| 22 | Consultancy services give in tender documents preparation for owner's consultancy of Boyabat 580 MW HEPP | Turkey | Socoin | 2009 |
| 23 | Testing and preperation of reports for speed governor and dynamic excitation systems in 3 hydroelectric power plants. Determination of requirements for the new speed governor and excitation systems. | Turkey | Confidential | 2011 |
| 24 | Preparation of administrative and technical specifications for 3 hydroelectric power plants which are going to be rehabilitated | Turkey | Confidential | 2011 - On going |